The Interim Wastewater Network (WWN) project consists of:
- the conception and designing of the principles for the WWN,
- the designing of the WWN as clusters,
- the procurement and installation of the PRC tanks (pre-casted concrete tanks),
- installing lateral pipelines from the household to the PRC tank),
- installing solid-free pipelines from the PRC tanks to the existed steel tanks,
- casting and installing inspection chambers (ICs),
- connecting households to the WWN,
- internal plumbing for selected households,
- backfilling the private pits,
- constructing private toilets for vulnerable cases,
- providing a large amount of cash for work opportunities for the refugees (community based approach project).
Emergency and reconstructionProduct design and engineeringSpecific to one or several countriesTreatment of wastewater or greywaterOtherOther funding source or unspecifiedCamps (emergency or longer term)International NGO
Jordan
Project location