The estimation of transportation costs, which will allow operators to make profit, is affordable to majority of residents in study area and as such there is a high chance for O&M of UDDTs to succeed in Arusha municipality. The important issue here is for the Municipal authority to establish resource-oriented section within the sanitation department to coordinate the process?There has been increase in number of UDDTs by 60% from 5 UDDTs in 2008 to 8 UDDTs in 2009 as a results of availability of masons trained by the ROSA project and promotion activities.
Senzia, M.A., Lechner, M., Müllegger, E., Kimwaga, R. (2009). Local requirements and constraints of O&M of urine diverting dry toilets Final report on O&M research topic ROSA project, Arusha, Tanzania
Operation, maintenance and sustainable services (WG10)Urine diversion dehydration toilets (UDDTs) English
Tanzania United Republic of
Type: application/pdf
Size: 2.1 MB