Second supervisor training on biogas plant construction Handout Ullrich, G. (2008)

Table of contents: 1. SITE SELECTION 2. THE REFERENCE LINE 3. CONSTRUCTION MATERIALS 4. CONSTRUCTION DETAILS 5. BLOCK AND BRICK LAYING 6. PRINCIPLES OF PIPING SYSTEMS FITTED TO BIOGAS PLANTS 7. ANNEXES 8. LITERATURE

Bibliographic information

Ullrich, G. (2008). Second supervisor training on biogas plant construction Handout PSDA program (Promotion of private sector development in agriculture), GTZ and AKUT, Nairobi, Kenya

Filter / Tags

Renewable energies and climate change (WG3)Biogas systems RuralPractitionersEnglishTrainer manuals (adult learning)

Related Countries

Kenya

Downloads

Training handout


Type: application/pdf
Size: 0.54 MB

Download

Second supervisor training on biogas plant construction

Published in: 2008
Pages: 0

Publisher:
PSDA program (Promotion of private sector development in agriculture), GTZ and AKUT, Nairobi, Kenya

Author(s):
Ullrich, G.

Uploaded by:

Stay in Touch Become a Member

Register for free as a SuSanA member to engage with thousands of sanitation enthusiasts on the forum, join working groups, and explore regional chapters.

Subscribe

Are we allowed to crumble with cookies and anonymous tracking?

We use cookies on our website. Some of them are essential for the operation of the site (so called session cookies), while others help us to improve this site and the user experience (tracking cookies). We use the application Matomo and the external service etracker to analyze your behavior on our website anonymously. Because we value your privacy, we are here with asking your permission to use the following technologies. You can change your settings any time via this link or the menu item in footer menu. For more information visit our Data Policy