Toolbox for PTM Process Step 1 - Supply and Demand Assessment GIZ (2017)

A collection of tools and reference material for the first step of the Public Toilet Management process and its focal areas is available for download here.

Focal Area: Data Collection • Pillars for public toilet management • Universal service standards and norms along the pillar for public toilet management • Aspects to be considered when assessing and planning public toilets in slums and tourist locations • Application of MoUD norms at the city level assessment Supply Assessment Results of Public Sanitation Scenario in Tirupati • Tirupati Needs Assessment Report • Tirupati Project Report - Volume I • Tirupati Project Report - Volume II Focal Area: Data Management • GIS Linked Asset Inventorising of Public Sanitation at Municipal Corporation of Shimla • Questionnaire for public toilet facilities of Shimla Municipal Corporation • User Manual for Sanitation Inventory Website of Shimla Municipal Corporation

Bibliographic information

GIZ (2017). Toolbox for PTM Process Step 1 - Supply and Demand Assessment SNUSP II Project

Filter / Tags

English

Related Countries

India

Downloads

Aspects to be considered in assessment and planning


Type: application/pdf
Size: 1.52 MB

Download

User Manual Tirupati


Type: application/pdf
Size: 0.7 MB

Download

Universal standards and norms


Type: application/pdf
Size: 1.58 MB

Download

Pillars for PTM


Type: application/pdf
Size: 1.56 MB

Download

Application of MoUD norms at the city level


Type: application/pdf
Size: 1.54 MB

Download

Tirupati needs assessment report


Type: application/pdf
Size: 2.78 MB

Download

Tirupati project report - volume I


Type: application/pdf
Size: 3.83 MB

Download

Tirupati project report - volume II


Type: application/pdf
Size: 2.77 MB

Download

Improved Public Sanitation Facilities: A case of Public Toilets in Tirupati


Type: application/pdf
Size: 0.9 MB

Download

GIS linkes asset inventorising of public sanitation Shimla


Type: application/pdf
Size: 2.26 MB

Download

Questionnaire public toilet facilities in Shimla


Type: application/pdf
Size: 0.08 MB

Download

User Manual for Sanitation Inventory Website of Shimla Municipal Corporation


Type: application/pdf
Size: 0.83 MB

Download

Toolbox for PTM Process Step 1 - Supply and Demand Assessment

Published in: 2017
Pages: 0

Publisher:
SNUSP II Project

Author(s):
GIZ

Uploaded by:


Location of library entry:

Stay in Touch Become a Member

Register for free as a SuSanA member to engage with thousands of sanitation enthusiasts on the forum, join working groups, and explore regional chapters.

Subscribe

Are we allowed to crumble with cookies and anonymous tracking?

We use cookies on our website. Some of them are essential for the operation of the site (so called session cookies), while others help us to improve this site and the user experience (tracking cookies). We use the application Matomo and the external service etracker to analyze your behavior on our website anonymously. Because we value your privacy, we are here with asking your permission to use the following technologies. You can change your settings any time via this link or the menu item in footer menu. For more information visit our Data Policy