The lead of this component was HUBER SE.
The treatment lants were deinstalled at the end of the project in December 2012.
Pictures of the deinstallation are available at the SuSanA Flickr album.
Various Authors (2010). Plant technology within SANIRESCH Project
Greywater or wastewaterUrineFactsheets and policy briefsPosters, brochures and flyersPresentationsEnglishGerman
Germany
Type: application/pdf
Size: 0.18 MB
Type: application/pdf
Size: 0.27 MB
Type: application/pdf
Size: 0.06 MB
Type: application/pdf
Size: 1.02 MB
Type: application/pdf
Size: 1.67 MB
Type: application/pdf
Size: 1.04 MB
Type: application/pdf
Size: 0.21 MB
Type: application/pdf
Size: 0.3 MB
Type: application/pdf
Size: 0.08 MB
Type: application/pdf
Size: 0.54 MB
Type: application/pdf
Size: 0.07 MB
Type: application/pdf
Size: 0.39 MB
Type: application/pdf
Size: 0.44 MB
Type: application/pdf
Size: 1.47 MB