Urine and brownwater separation at GTZ main office building Eschborn, Germany Case study of sustainable sanitation projects Winker, M., Saadoun, A. (2011)

This case study is about a demonstration project in the headquarters of GTZ in Eschborn, Germany. The project consists of 50 urine-diversion flush toilets, 23 waterless urinals and 10 m³ urine storage tank. Objectives of the project: 1. To demonstrate the implementation of an ecological sanitation (ecosan) concept (here with urine-diversion flush toilets, urine storage and reuse) in an urban context. Ultimatively, if this technology was used widely in Germany, it could also prevent pharmaceutical residues contained in urine from entering into surface water and groundwater (as these substances are only partially removed in conventional wastewater treatment plants). 2. To reduce the amount of water used in the GIZ House 1 building. 3. To research important aspects of ecosan systems in Germany (social acceptance, reuse of urine in agriculture); this is done in Phase 2. The GIZ headquarters in Eschborn is frequently visited by international GIZ staff and decision makers, making this a good location for the demonstration of innovative ecological sanitation concepts. The GIZ ecosan team regularly conducts guided tours through the facilities. A demonstration room with various urine-diversion toilet models from all over the world is adjacent to the urine storage tanks. Due to the complete renovation of the buildings facade and the use of energy efficient heating systems and boilers the energy consumption of House 1 was substantially reduced. The new ground design and a green roof (about 50 % of the total surface) enhance a positive microclimate and reduce rainwater runoff. The following impacts of this project can be highlighted: 1. This project demonstrates the feasibility of urine and brownwater separation in an urban context to visitors from all over the world and thus helps to disseminate the ecosan concept. 2. By introducing an innovative sanitation system at its own main office building, GIZ shows its commitment to the ecosan approach. 3. The waterless urinals save water compared to conventional urinals. 4. This project has raised the visibility of the ecosan program within GIZ.

Bibliographic information

Winker, M., Saadoun, A. (2011). Urine and brownwater separation at GTZ main office building Eschborn, Germany Case study of sustainable sanitation projects Sustainable Sanitation Alliance (SuSanA)

Filter / Tags

Urban (entire city)Case studies in SuSanA templateEnglish

Related Countries

Germany

Downloads

Urine and brownwater separation at GTZ main office building Eschborn, Germany


Type: application/pdf
Size: 0.65 MB

Download

Urine and brownwater separation at GTZ main office building Eschborn, Germany

Published in: 2011
Pages: 0

Publisher:
Sustainable Sanitation Alliance (SuSanA)

Author(s):
Winker, M., Saadoun, A.

Uploaded by:


Location of library entry:

Stay in Touch Become a Member

Register for free as a SuSanA member to engage with thousands of sanitation enthusiasts on the forum, join working groups, and explore regional chapters.

Subscribe

Are we allowed to crumble with cookies and anonymous tracking?

We use cookies on our website. Some of them are essential for the operation of the site (so called session cookies), while others help us to improve this site and the user experience (tracking cookies). We use the application Matomo and the external service etracker to analyze your behavior on our website anonymously. Because we value your privacy, we are here with asking your permission to use the following technologies. You can change your settings any time via this link or the menu item in footer menu. For more information visit our Data Policy